Project spotlights.A closer look.
Conveyor supports, light-pole retrofits, and oilfield rack fabrication—shown through selected projects.

H-piling beam welding.
Greene County, PA.
JJ Mobile Welding spliced sections of more than 40 H-piling beams on site to achieve the required lengths for a PennDOT project to repair an energy transfer road in Greene County, PA. The work was completed during the COVID period.
- Scope
- On-site welding of more than 40 H-piling beams
- Material
- H-piling structural steel beams
- Duration
- 3–4 weeks
The beam sections were joined using E7018 stick welding for full-penetration splices, with bevel preparation and back gouging performed using an air-arc gouger.

Washington Wild Things Stadium
JJ Mobile Welding partnered with a local commercial electrical contractor on a multiweek retrofit of all stadium light poles. Our welding work included electrical conduit fittings, handhole access openings, and mounting brackets for large electrical enclosures.
- Scope
- Stadium light-pole retrofit
- Duration
- Multiweek project
- Material
- Galvanized steel
The job was performed from a large boom lift, using respirators, fall protection, and welding PPE.

Amazon warehouse.
Conveyor support structure.
JJ Mobile Welding fabricated and welded a conveyor support structure on-site inside the new Amazon warehouse in Imperial, PA. Built in its final location to the conveyor manufacturer’s engineered plans, the structure was assembled when the project team needed last-minute welding and fabrication support.
- Scope
- On-site conveyor support fabrication and welding
- Duration
- 3 days
- Material
- A500 square and rectangular tubing, ¼-inch wall; ⅜-inch gusset plates.
The project required submission of our AWS D1.1 welder qualification documentation.
We stepped in when the team did not have anyone available to assemble the structure, helping resolve an urgent need on a high-profile warehouse project.
Explore structural welding & fabrication ↗
EV charger post
fabrication.
JJ Mobile Welding fabricated 25 EV charger posts for Metal Supermarket in Coraopolis, PA. The posts were built from A500 square tubing and ¼-inch steel plates, with all holes drilled using a magnetic drill.
- Scope
- Fabricate 25 EV charger posts
- Duration
- 3–4 days
- Material
- A500 square tubing and ¼-inch steel plates.
Metal Supermarket · Coraopolis, PA
Explore custom fabrication ↗Oilfield racks.
Custom-fabricated oilfield pipe racks for inspection, staging, and storage.
- Scope
- Fabrication of different rack styles for inspection, staging, and storage—close to 100 sets.
- Duration
- 1–2 years
- Material
- 5½-inch casing and 2⅞-inch tubing
Inspection & staging racks
Pipe storage racks