Skip to content
Selected commercial & industrial work

Project spotlights.A closer look.

Conveyor supports, light-pole retrofits, and oilfield rack fabrication—shown through selected projects.

H-piling beam splice with E7018 electrodes and red air-arc gouger at the lower right
H-piling beam splice, electrodes, and air-arc gouger.
Project spotlight / H-piling beam welding

H-piling beam welding.
Greene County, PA.

JJ Mobile Welding spliced sections of more than 40 H-piling beams on site to achieve the required lengths for a PennDOT project to repair an energy transfer road in Greene County, PA. The work was completed during the COVID period.

Scope
On-site welding of more than 40 H-piling beams
Material
H-piling structural steel beams
Duration
3–4 weeks

The beam sections were joined using E7018 stick welding for full-penetration splices, with bevel preparation and back gouging performed using an air-arc gouger.

Passed on the first inspectionAn independent testing company performed ultrasonic NDT on the welds. All passed the first time, with no repairs required.
Watch the on-site welding video ↗
H-piling beams and welding leads laid out at the Greene County jobsite
H-piling beams laid out for field welding.
Welded H-piling beam joint with E7018 electrodes at the jobsite
Welded beam joint and E7018 electrodes.
H-piling beams with an electrode holder and welding electrode pointing upward
Beam splicing setup with the electrode holder.
Welder working on a stadium lighting pole from a boom lift
Light-pole welding from a boom lift.
Project spotlight / Light-pole retrofits

Washington Wild Things Stadium

JJ Mobile Welding partnered with a local commercial electrical contractor on a multiweek retrofit of all stadium light poles. Our welding work included electrical conduit fittings, handhole access openings, and mounting brackets for large electrical enclosures.

Scope
Stadium light-pole retrofit
Duration
Multiweek project
Material
Galvanized steel

The job was performed from a large boom lift, using respirators, fall protection, and welding PPE.

Related light-pole workWe also completed light-pole welding at Schenley Park in Pittsburgh.
Explore structural welding & fabrication ↗
JJ Mobile Welding service truck and boom lift at the stadium
Mobile welding rig and boom lift on site.
Welded handhole access opening in a galvanized stadium lighting pole
Welded handhole access opening.
Conveyor support structure fabricated on-site inside the Amazon warehouse in Imperial, Pennsylvania
Conveyor support structure built in its final position.
Project spotlight / Imperial, PA

Amazon warehouse.
Conveyor support structure.

JJ Mobile Welding fabricated and welded a conveyor support structure on-site inside the new Amazon warehouse in Imperial, PA. Built in its final location to the conveyor manufacturer’s engineered plans, the structure was assembled when the project team needed last-minute welding and fabrication support.

Scope
On-site conveyor support fabrication and welding
Duration
3 days
Material
A500 square and rectangular tubing, ¼-inch wall; ⅜-inch gusset plates.

The project required submission of our AWS D1.1 welder qualification documentation.

We stepped in when the team did not have anyone available to assemble the structure, helping resolve an urgent need on a high-profile warehouse project.

Explore structural welding & fabrication ↗
Welded base plate and gusset on the conveyor support structure
Base plate and gusset fabrication detail.
Welded upper connection on the conveyor support structure
Upper support connection detail.
Fabricated EV charger posts arranged in the shop at Metal Supermarket
Completed EV charger posts.
Project spotlight / Coraopolis, PA

EV charger post
fabrication.

JJ Mobile Welding fabricated 25 EV charger posts for Metal Supermarket in Coraopolis, PA. The posts were built from A500 square tubing and ¼-inch steel plates, with all holes drilled using a magnetic drill.

Scope
Fabricate 25 EV charger posts
Duration
3–4 days
Material
A500 square tubing and ¼-inch steel plates.

Metal Supermarket · Coraopolis, PA

Explore custom fabrication ↗
Welded steel plate connection on an A500 square tubing EV charger post
Welded plate connection detail.
Magnetic drill making holes in square tubing for EV charger posts
Drilling the post holes with a magnetic drill.
Project spotlight / Oilfield fabrication

Oilfield racks.

Custom-fabricated oilfield pipe racks for inspection, staging, and storage.

Scope
Fabrication of different rack styles for inspection, staging, and storage—close to 100 sets.
Duration
1–2 years
Material
5½-inch casing and 2⅞-inch tubing

Inspection & staging racks

Triangular oilfield pipe inspection and staging racks
Triangular inspection and staging racks.
Oilfield pipe inspection racks with triangular bracing
Another view of the inspection racks.

Pipe storage racks

John Pawlish fabricating oilfield pipe storage racks beside the mobile welding rig
Building the pipe storage racks.
John Pawlish welding an oilfield pipe storage rack upright
Welding the storage-rack uprights.
Finished oilfield pipe racks with tall yellow uprights
Finished oilfield pipe storage racks.
Oilfield pipe stacked in fabricated storage racks with tall yellow uprights
The finished storage racks holding pipe.

Explore fabrication capabilities ↗

Have work like this?

Send the drawings or repair scope and we’ll review what your project needs.

After-hours support: leave a voicemail or submit an estimate request and we’ll follow up promptly.